How it works
Three steps, eyes off the screen
Put in your AirPods
Pick a wall target at eye level and pop in your AirPods. SteadyGaze detects them automatically and pauses on its own if they drop out mid-session.
Pocket the phone
Stand, march, or walk. The sensor in your AirPods measures how fast your head turns, so nothing pulls your gaze back toward a screen or a camera.
Move to the sound
A soft tick means you're on pace. Different tones tell you when you're going too fast or too slow. Your eyes stay locked on the target the whole time.
What you get
Built for eyes that need to stay still
Every gaze-stabilization app before this one asked you to watch a screen. That fights the exercise. SteadyGaze does the opposite.
Eyes on the wall, not the glass
Gaze exercises only work when your eyes stay fixed on a real target. Audio coaching doesn't compete for your gaze, so you can do the movement the way your therapist meant it.
Your AirPods do the measuring
The motion sensor already in your AirPods tracks your head speed at 25 readings a second. Cleaner kinematics than a front-facing camera, and nothing to set up.
The exercises, not just a timer
VOR x1 and x2 programs from beginner to advanced, with cadences and speed bands drawn from vestibular rehab research. Or enter the exact reps and pace your clinician prescribed.
See it working
Each session logs your reps, peak head speed, range of motion, time on pace, and a before-and-after dizziness rating. Watch the trend build and hand your provider a clean PDF or CSV.
Move anywhere
No spot to stand in, no device to face. Practice at the kitchen counter or pacing the hallway. The coaching follows your head, not the room.
Private by design
Everything runs on your device. No account, no upload, no analytics. Your dizziness diary stays yours.
A look inside
A calm screen you barely have to look at
Dark, low-glare, and designed for motion-sensitive eyes. The cue is carried by sound and color, so a glance is all you ever need.
No compatible AirPods? SteadyGaze still works as a guided metronome with a manual log and the starter programs, so you can keep practicing while you decide. Head-motion coaching needs AirPods Pro, AirPods 3 or 4, AirPods Max, or Beats Fit Pro.